Crane Creek Clubhouse Project

My company worked with the general contractor Jordan Wilcomb to complete the wood portion of this project. The structure consisted of an integrated wood, steel, and concrete design. The floor and roof construction was designed with redbuilt trusses. This was a 18,000 s.f. high profile project that required detailed coordination and planning to achieve a timely completion of the project.

Gem Prep North and South Charter School Projects.

K-12 building with a full size gym and cafeteria. The framed structures for both projects were designed with structural wood bearing construction with wood floor and roof trusses. Both projects were 65,000 to 75,000 sq ft. The project was completed in 8 weeks, this was 3 weeks ahead of schedule. The General Contractor on site was Bouma USA management